AKKUYU NUCLEAR POWER PLANT

Employer:

Akkuyu Nükleer Anonim Şirketi (Rosatom/Russian Federation)

Contract Date:

22 July 2019

Completion date:

In progress

Project Location

Mersin / Türkiye

It is Türkiye’s first Nuclear Power Plant project.

  • Total capacity: 4.800 MW (Gross)
  • 4 power units with a capacity of 1200 MW each
  • Overall production 35 B kWh/year (approx.)

T26 RAILWAY TUNNEL PROJECT

Employer:

Republic of Türkiye State Railways (TCDD)

The details of our project, which is located in the middle of the Ankara-Istanbul high-speed train corridor, which has a great importance in the transportation network of our country, are as follows.

Contract Date:

10 April 2017

Completion Date

89% - In Progress

Project Location

Bilecik, Türkiye

Within the scope of the railway tunnel construction works and the scope of the project, which is in progress with NATM in accordance with the high speed train travel standards:

  • T24 Main Line Tunnel Remaining Works (148m)
  • T24-T26 Cut-and-Cover Construction (86m)
  • Opening of T26 Main Line Tunnel (5.588m)
  • Safety Tunnels (2.196m)
  • Cut-and-Cover and Diaphragm Wall Construction between T26-T27 (980m)
  • T27 Main Line Tunnel Remaining Works (574m)